ITU-T K21 PDF

Recommendation ITU-T K specifies resistibility requirements and test procedures for telecommunication equipment that is installed in or on a customer’s. Recommendation ITU-T K specifies resistibility requirements and test The approval of ITU-T Recommendations is covered by the procedure laid down in. ITU-T Recommendation K was revised by ITU-T Study Group 5 () The approval of ITU-T Recommendations is covered by the.

Author: Dilrajas Shakarg
Country: Bolivia
Language: English (Spanish)
Genre: Spiritual
Published (Last): 3 January 2010
Pages: 188
PDF File Size: 4.64 Mb
ePub File Size: 18.14 Mb
ISBN: 466-7-11328-751-1
Downloads: 82334
Price: Free* [*Free Regsitration Required]
Uploader: Arashirn

Interested in an update of your current version?

Entire test installations can be integrated in one single test sequence. In this mode all parameters are open to be changed. Overvoltages or overcurrents covered by this Recommendation include surges due to lightning on or near the line plant, short-term induction from adjacent a. No matter if you want to verify the test pulse before conducting a test or to monitor the DUTs behaviour during test iec.

ITU-T Recommendations

Electromagnetic field compliance assessments for 5G wireless networks. Very few remote control commands are required to set-up your instrument. Product selector Product news Data sheets Software autowave.

Recorded fail events are stated along with the comments entered by the operator. The sources for overvoltages in internal lines are mainly inductive coupling caused by lightning currents being conducted in nearby lightning strokes or lightning currents being conducted in nearby conductors.

Editions Related supplement s Implementer’s guide s Ed. Patent statement s Development iyu-t [ 11 related work items in progress ktu-t. Select Language english german french japanese polish russian chinese. Committed to connecting the world. Resistibility of telecommunication equipment installed in customer premises to overvoltages and overcurrents.

  CPME 320 PDF

The more complex a DUT is the higher is the demand for monitoring during the test and control the test based on the feedback received. By continuing to use the site you agree to our privacy and cookie policy.

Graphics tiu-t the test pulses accomplish the parameter settings. Not only single tests, either user defined or based on standards, can be performed, but single Test routines can be linked together to form a complete test sequence.

International Standards

This functionality allows fully automated test runs combining different test requirements. The header includes all general data of the test e. Contact Recommend page Sitemap Imprint Privacy. Please send us your inquiry! Controller for External Measuring Equipment. User Defined Test routines based on standard test routines can be created iyu-t the Special Mode from each standard pulse window.

The current version iec. Study Groups tree view. Radiofrequency electromagnetic field Itu–t exposure levels from mobile and portable devices during different conditions of use.

EM TEST – Products – l

An exhaustive standards library includes international basic and generic standards, product family standards and product standards from various application areas. Complete Reporting according to International Standards Requirements.

Using respective mask files the test report can be arranged and printed out to comply with company specific requirements. Itu-tt standards implemented in the 8. Test parameter settings and detailed test data e.

  BABILONIA DISCEPOLO PDF

A summary of test results is given.

通訊網路 – Fuzetec Technology Co., Ltd. | 富致科技 PPTC Resettable Fuse

The test data iti-t can be automatically converted into Rich-Text-Format and post-processed with any software tool recognising rtf-format e. Standard Test Routines are started by a few key strokes only with all parameter settings already pre-programmed. Major changes compared with the version of this Recommendation include: Editions Related supplement s Implementer’s guide s.

User Defined Test routines are easily created and saved to the test files library. Feedback Contact Us Accessibility. Minimum operator effort for maximum test results, easy and fast, reliable and reproducible. Program entire Test Sequences using the iec.

In the Standard Pulse window you can select the required test level as requested for the test. Analysis of electromagnetic compatibility aspects and definition of requirements for 5G mobile systems. Standard itu-f New standards implemented in the 8.

The continuously updated and extensive standards library is only one of these benefits. Or if less severe iec. A test can be stopped at the point any malfunction occurs. All i21 parameters are automatically set accordingly.